Tüm Referanslar
3S Kale Enerji Üretim – İstanbul, | Osmanbükü Project, Manufacturing 1 pc. Separator, ASME U Stamp, 2019 |
Aalborg Boilers – Denmark, | Altınyıldız – İstanbul, Waste Heat Recovery Boiler, 1997 |
Goodyear – Adapazarı, Waste Heat Recovery Boiler, 1997 | |
Orta Anadolu Tekstil – Kayseri, Waste Heat Recovery Boiler, 1998 | |
Toros Gübre – Mersin, Waste Heat Recovery Boiler, 1998 | |
Gaza Power Plant –Palestine, 4 sets, Blow Down Tank Manufacturing, 2000 | |
Glaxo Wellcome – UK, Air Tank and Blow Down Tank Manufacturing, 2000 | |
Tioxide – UK, Air Tank and Blow Down Tank Manufacturing, 2001 | |
Aalborg Boilers – Finland, | Aksa / Cengiz - Samsun, Spool Pipe Manufacturing, 2002 |
MOSB - Manisa, Waste Heat Recovery Boilers Platforms Manufacturing, 2005 | |
44 sets Spool Pipe and Platform for Cuba Power Plant, 2007 | |
Aalborg Energie Technik- Denmark | MAV Biomass Power Plant, 3 pcs. Pressure Vessels. 2021 |
Aalborg Engineering – Denmark, | Zorlu Enerji – Ankara, WHRB Support Structure and Duct Manufacturing, 2001 |
Ayen Enerji – Ankara, WHRB Duct Manufacturing, 2003 | |
Zorlu Enerji–Kayseri, 3 sets WHRB Ducts and Deaerators Manufacturing, 2004 | |
Çebi Enerji – Tekirdağ, WHRB Ducts, Deaerator, Tanks Manufacturing, 2005 | |
Zorlu Enerji-Lüleburgaz, WHRB Support Structure, Ducts Manufacturing, 2005 | |
BOSEN-Bursa, WHRB Support Structure Ducts, Deaerator Manufacturing, 2005 | |
Zorlu Enerji–Russia, 6 sets HP and 6 sets LP Drum, 2007 | |
Zorlu Enerji–Russia, 6 sets Duct Manufacturing, 2007 | |
Delta Enerji- Çorlu, SG8 Type Boiler Modules and HP&LP Drum Manufacturing, 2008 | |
Cengiz Enerji–Samsun, 2 sets of Inlet Ducts Manufacturing, 2010 | |
Cengiz Enerji, 2 sets Deaerator, Feed Water and Blow Down Tank Manufacturing, 2010 | |
Bosen Enerji–Bursa, 2 sets of SG8 Type Boiler Modules Manufacturing, 2010 | |
ALES–Aydın, 1 set of SG8 Type Boiler Modules Manufacturing, 2011 | |
Tüpraş–İzmir, 1 set of SG8 Type Boiler Modules Manufacturing, 2011 | |
AGE–Denizli, 3 sets of SG8 Type Boiler Modules Manufacturing, 2011 | |
Tüpraş–İzmit, 2 set of SG8 Type Boiler Modules Manufacturing, 2012 | |
Tüpraş–İzmit, 1 set of SG8 Type Boiler Modules Manufacturing ”Replacement Project” , 2012 | |
Tüpraş–Kırıkkale, 1 set of SG4 & 1 set of SG6 Type Boiler Modules and Drums Manufacturing, 2015 | |
Akenerji – İstanbul, | Mebal – Çorlu, Erection of Taurus 60 Turbine, Waste Heat Recovery System (2 sets), 2 pcs. 250 m3 Naphta Tank Design, Manufacturing and Erection, 25 t/h Deaerator and Feed Water Tank Design, Manufacturing and Erection, Stainless & Carbon Steel Piping and Insulation for System, 2000 |
Gürsu – Bursa, Erection of Taurus 60 Turbine, Waste Heat Recovery System (3 sets), 1 pc. of 350 m3 Naphtha Tank, Dearator and Feed Water Tank Design, Manufacturing and Erection, Stainless & Carbon Steel Piping and Insulation for System, 2001 | |
Batıçim – İzmir, 2 pcs. 1000 m3 Water Tank Design, Manufacturing and Erection, 2002 | |
Kemalpaşa – İzmir, 128 MW Combine Cycle Power Plant, Balance of Plant, Design, Manufacturing, Equipment Procurement, Erection, Commissioning, 2004 – 2005 | |
Kemalpaşa – İzmir, 128 MW Combine Cycle Power Plant, 1 pc. 1200 m3, 1 pc. 270 m3 Water Tank and 1 pc. 530 m3 Diesel Storage Tank Design, Manufacturing and Erection, 2002 | |
AKG Yalıtım– İzmir, | 1 pc. Economizer for Steam Boiler, 2005 |
2 sets Economizer, 1 pc Heat Exchanger and 2 sets Jet-Cap Design, 2006 | |
9 sets Autoclaves Lengthening, 2006 | |
1 pc. Autoclave for Laboratory, 2007 | |
1 pc. Water Heater Manufacturing and Erection, 2007 | |
5 sets Autoclaves Manufacturing, 2008 | |
Piping of 5 sets Autoclaves, 2008 | |
9 sets Autoclaves Lengthening, 2014 | |
Alkim Kağıt – İzmir, | Kemalpaşa – İzmir, Waste Heat Recovery Boiler with Auxiliary Firing System, Main and By-pass Stack for Taurus 60 type Turbine, 2 pcs. 182 m3 Naphtha Tanks and Fuel System, 2001 |
Kemalpaşa – İzmir, Cogeneration Plant behind T60 Gas Turbine, 2011 | |
Altınmarka – İstanbul, | Manufacturing of Deaerator, Feed Water Tank, Heat exchanger and Platform, 2008 |
Arenko – İstanbul, | Erbakır – Denizli, Cogeneration Plant, 2001 |
Arıtım Mühendislik – İstanbul, | Birlik Enerji – Denizli, Vessels and Sand Filter Manufacturing 2001 |
Atakaş Metalurji – Gebze, | WHRB and Auxiliaries behind T70S Gas Turbine, 2011 |
Atilla Makina– Ankara, | Efemçukuru-Menderes Site, 1 pc. 28 m3, 1 pc. 1,5 m3 and 2 pcs. 0,75 m3 Pressurized Air Tanks Manufacturing, ASME U Stamp, 2010 |
Efemçukuru-Menderes Site, 1 pc. 50 m3 , 1 pc. 28 m 3 , 1 pc. 1,5 m 3 and 3 pcs. 0,75 m 3 Pressurized Air Tanks Manufacturing, ASME U Stamp, 2010 | |
Efemçukuru-Menderes Site, 1 pc. 0,5 m3 Pressurized Air Tank Manufacturing, ASME U Stamp, 2011 | |
Atlas Copco Makinaları – İstanbul, | 2 sets Expander Housing and Supports Manufacturing, 2015 |
2 sets Silencers, 2016 | |
1 set Expander Housing Manufacturing, 2016 | |
1 set Expander Housing Manufacturing, 2018 | |
1 pc. Expander Discharge Spool Manufacturing, 2018 | |
1 pc. Housing Support & Base Machine Manufacturing, 2018 | |
1 set Discharge Silencer, 2018 | |
2 pcs. Housing Support Manufacturing, 2018 | |
Machine Skid Base Manufacturing, 2018 | |
1 pc. Expander Discharge Spool Manufacturing, 2019 | |
2 sets Expander Housing Manufacturing, 2019 | |
2 pcs. Discharge Silencer, 2019 | |
Barmek Gama – Ankara, | Kırıkkale, 130 MW Power Plant Tanks Design, Manufacturing and Erection, 3x7500 m3 , 1x1000 m3 , 1x300 m3 , 4x200 m3 , 1x50 m3 , 3x40 m3 , 1x30 m3 , 1x20 m3 , 1x16 m3, 2001 |
Besler Gıda – İstanbul, | Deaerator, Feed Water Tank and Condensate Tank Manufacturing, 2003 |
Bir Yapı – Ankara, | Petkim – İzmir, 3 sets Sand Filters Manufacturing, 2003 |
Borusan Güç Sistemleri - İstanbul, | Tanrıverdi Tekstil – Çorlu, 4 sets 3516B Gas Engine Cogeneration Plant, 2003 |
Aktin Tekstil – Çorlu, 4 sets. 3520 Gas Engine Cogeneration Plant, 2003 | |
Saray Örme – Bursa, 3 sets 3516B Gas Engine Cogeneration Plant, 2003 | |
Çelik Halat – İzmit, 2 sets 3516B Gas Engine Cogeneration Plant, 2003 | |
Baydemirler – İstanbul, 3 sets 3520 Gas Engine Cogeneration Plant, 2004 | |
Mercedes Benz – İstanbul, 4 sets 3520 Gas Engine Cogeneration Plant, 2004 | |
Küçükçalık – Bursa, 4 sets 3520 Gas Engine Waste Heat Recovery System, 2005 | |
Colin’s Jeans – Çorlu, 1 pc. 3516B Gas Engine Waste Heat Recovery System, 2005 | |
Conrad – İstanbul, 1 pc. 3516C Gas Engine Waste Heat Recovery System, 2005 | |
Kilsan-2 sets 3516C Gas Engine Cogeneration Plant, 2006 | |
Tenghiz Chevron Oil–Kazakhstan, 2 sets 3512 Gas Engine Packing, 2003 | |
Hurricane – Kazakhstan, 2 sets 3508 Gas Engine Packing, 2003 | |
Coca Cola– Kazakhstan, 2 sets 3520 Gas Engine Waste Heat Recovery System, 2006 | |
Four Seasons Otel– İstanbul, 1 pc. 3516B Gas Engine Waste Heat Recovery System, 2006 | |
Safisa Otel– Antalya, 2 sets 3516B Gas Engine Cogeneration Plant, 2006 | |
Kurtoglu Aluminyum– Çorlu, 2 sets 3516B Gas Engine Cogeneration Plant, 2006 | |
Botaş, 2 sets Duct Manufacturing for 3520C Gas Engine, 2007 | |
Konya Şeker, 1 set 3520C Gas Engine Waste Heat Recovery Syst, 2007 | |
Ormed II– Kazakhstan, 5 sets 3520C Gas Engine Cogeneration Plant, 2007 | |
Pepsi Cola– Kazakhstan, 2 sets 3520C Gas Engine Waste Heat Recovery Syst, 2007 | |
Mauri Maya– Bandırma, 2 sets 3520C Gas Engine Cogeneration Plant, 2007 | |
Polat Hotel– İstanbul, 1 pc. 3516C Gas Engine Waste Heat Recovery Syst, 2007 | |
Kipa Tesco– İzmir, 2 sets 3516B Gas Engine Waste Heat Recovery Syst, 2008 | |
Melike Tekstil– Gaziantep, 1 set 3516C Gas Engine Cogeneration Plant, 2009 | |
Naksan – Gaziantep, 4 sets 3520C Gas Engine Cogeneration Plant, 2009 | |
Mardan Palace – Antalya, Changing of the By-pass System, 2009 | |
Sabiha Gökçen Airport – 2 sets of Hot Water Boiler Manufacturing, 2009 | |
Orkide Yağ– İzmir, 1 set of 3516C Gas Engine Waste Heat Recovery System, 2010 | |
Durum Gıda– Mersin, 1 set 3516C Gas Engine Waste Heat Recovery System, 2010 | |
Bozetto Kimya – Tire, | Textile Additives and Naphthalene Sultanate Production Plant, Turn-key, 1998 |
Erection of Reactor, Tank Manufacturing, Erection and Piping, 2003 | |
Reactor and Neutralizer Tank Erection and Piping, 2007 | |
1 pc. Formaldehyde Tank and 1 pc. Melter Tank Manufacturing and Erection, 2006 | |
Bronswerk Heat Transfer BV-Holland | 2 sets High Pressure Steam Generator, ASME Partial U Stamp, 2009 |
Can Tekstil – Çorlu, | T60 Gas Turbine, Economizer Manufacturing behind WHRB, 2000 |
Waste Heat Recovery Boiler for Gas Engine, 2002 | |
Camiş Elektrik – Lüleburgaz, | Trakya Region Power Plant, Inlet Duct Manufacturing and Erection, 2009 |
Dan Power –Brasil, | İpek Kağıt – Yalova, Waste Heat Recovery Boilers, 2004 |
Birlik Mensucat –Kayseri, By-pass System Manufacturing, 2004 | |
Desa – İzmir, | EnerjiSA – İzmit, Waste Heat Recovery Boiler Mechanical Design, 1997 |
Doğa Enerji – İstanbul, 20 MW Hot Water Boiler Boiler Design, 1997 | |
Delta Enerji – Lüleburgaz | Erection of SG8 type WHRB, 2009 |
Erection of ACC and Dresser-Rand "Murray" type Steam Turbine, 2009 | |
Efor Makina- Ankara, | Design of 6 Heat Exchangers, 2007 |
Enerjeo Holding - İstanbul, | Kemaliye Project, Manufacturing 8 pcs. Separators, ASME U Stamp, 2015 |
Kemaliye Project, Manufacturing 3 pcs. Separators, ASME U Stamp, 2016 | |
Enka Teknik – İstanbul, | İzmir CCPP, Water Treatment System, Manufacturing and Erection, 2001 |
Eren Holding– İstanbul, | Modern Enerji– Çorlu, 4 sets Water Heater, 2 units Stack, 2007 |
Çatalağzı Thermic Power Plant– Zonguldak, Detail Engineering of Main Cycles Including Steam, Feed Water and Condensate Systems, 2008 | |
Çatalağzı Thermic Power Plant – Zonguldak, 1 pc. Deaerator, 1 pc. Blow-Down Tank, 3 sets Air Tanks, 2 sets Fuel-Oil Tanks (1350 m³), 2 pcs. 25 t/h and 4 pcs. 52 t/h Heat Exchangers, 2008 | |
Ergos SA – Spain, | Besler Gıda - Istanbul, 2 sets Waste Heat Recovery Boilers (Unit 3, 4) 2002, 2003 |
Şahinler Enerji – Çorlu, 1 pc. Waste Heat Recovery Boiler, 2002 | |
Besler Gıda – İstanbul, Economizer Installation, 2005 | |
Exergy SPA – Italy | Pamukoren Project, 2 pcs Vapour Headers Manufacturing, 2014 |
Pamukoren Project, 1 pc Vapour Header & 1 pc Hotwell Manufacturing, 2014 | |
Karkey Project, 18 pcs NCG Extraction, 6 pcs Isopentane Drain Tanks, 2015 | |
Greeneco Project, HP and LP Turbine Discharge Pipes, 2015 | |
Greeneco Project, 2 pcs NCG Extraction, 2 pcs Isopentane Drain Tanks, 2015 | |
E035 - Greeneco Project, ORC System Spool Piping Manufacturing, 2015 | |
E028 - Ken Kipaş Project, ORC System Spool Piping Manufacturing, 2015 | |
E029 - Ken Kipaş Project, ORC System Spool Piping Manufacturing, 2015 | |
E035 - Greeneco Project, HP and LP Turbine Discharge Pipes, 2016 | |
Greeneco Project, 2 pcs NCG Extraction, 2 pcs Isopentane Drain Tanks, 2016 | |
2 pcs. Venture Tube Manufacturing, 2016 | |
6 pcs NCG Extraction, 2 pcs Isopentane Drain Tanks, 2016 | |
Spool pipes for ACC HP& LP System, 2016 | |
2 Sets Manufacturing of ACC HP&LP Hotwell, 2016 | |
6 pcs NCG Extraction, 2 pcs Isopentane Drain Tanks, 2016 | |
E028 – E029 - Ken Kipaş Project, CCCW Spool Piping, 2016 | |
E039 - Beştepe Project, Input Group, Condensate Knock-Out Pot 1 pc., Motive Fluid Storage Tank 2 pcs. Manufacturing, 2016 | |
E041 – 2 pcs. HP and 2 pcs. LP NCG Extraction, 1 pc. Butane Drain Tank, 2017 | |
E048 – 6 pcs NCG Extraction, 2 pcs Isopentane Drain Tanks, 2018 | |
E050 - Input Group, 2019 | |
E057 – ORC, Brine & CCCW spool Piping, 2020 | |
EÜAŞ – Tunçbilek, | Water Treatment Rehabilitation for 4th and 5th Unit of Thermic Power Plant, 2006 |
GEA-BTT – France | Steam Distribution Duct Manufacturing, ASME Partial U Stamp, 2008 |
GEA- Germany | Eren Holding–Çatalağzı, ESD&SDD Duct Manufacturing, 2007 |
Rostock, ESD&SDD Duct Manufacturing, 2007 | |
Witzenhausen, ESD&SDD Duct Manufacturing, 2007 | |
Bielefeld, ESD&SDD Duct Manufacturing, 2008 | |
Gümüşköy Jeotermal A.Ş. – Aydın, | Gümüşköy Project, Manufacturing of 3 pcs. Separators, 2015 |
Gümüşköy Project, Manufacturing of 1 pc. Accumulator and 2 pcs. NCG Separators Tanks, 2015 | |
GÜRMAT – Aydın, | Germencik-III Project, Manufacturing of 7 pcs of Pressure Vessels for Geothermal Power Plant, 2014 |
Germencik-III Project, Manufacturing of 2 pcs of Cross Over Duct for Geothermal Power Plant, 2014 | |
Efe-III Project, Manufacturing of 3 pcs of Pressure Vessels (HP Separator, Demister & Brine Volume Tank) for Geothermal Power Plant, ASME U Stamp, 2014 | |
Efe-II Project, Manufacturing of 1 pc of Pressure Vessel (HP Flash Separator Tank) for Geothermal Power Plant, ASME U Stamp, 2014 | |
Efe-I Project, Manufacturing of 2 pcs of Pressure Vessel (HP Separator Tanks) for Geothermal Power Plant, ASME U Stamp, 2014 | |
Efe-I Project, Manufacturing of 3 pcs of Pressure Vessels (LP Separators & Demister Tank) for Geothermal Power Plant, ASME U Stamp, 2014 | |
Efe-I Project, Manufacturing of 1 pc of Pressure Vessel (HP Demister Tank) for Geothermal Power Plant, ASME U Stamp, 2014 | |
Efe-IV Project, Manufacturing of 5 pcs of Pressure Vessels (HP Flash Separator, Demister, Brine Volume & Motive Fluid “Pentane” Tank) for Geothermal Power Plant, ASME U Stamp, 2014 | |
Havatek – İzmir | Separator and Desalter Manufacturing, 2020 |
HN Makine – İzmir, | 5 sets Hot Water Heater (Biogas System) Manufacturing, 2018 |
İltekno – İstanbul, | Etibor - Emet, 2 sets WHRB Partly Manufacturing, 2002 |
Özdilek - Bursa, 1 pc. WHRB Partly Manufacturing and Erection, 2002 | |
İsko Tekstil – İnegöl, | 2 sets Hot Water Heater behind Cogeneration System, 2001 |
Innovative Steam Tech – Canada, | South Hedland Project, 2 sets Spool Piping Manufacturing, 2015 |
Kartonsan – İzmit, | 2 sets Eco and Hot Water Heater for WHRB (Unit 1, 2), 2003 |
2 sets Eco and Hot Water Heater for WHRB (Unit 3, 4), 2005 | |
Kar Group – Iraq | Luhais&Subba Oil Field Project, 5 pcs LP Seperator, 10 pcs Flare Blowcases Tank Manufacturing, ASME U Stamp, 2010 |
Luhais&Subba Oil Field Project, 15 pcs Seperators & Glycol Contactors Manufacturing, ASME U Stamp, 2011 | |
Luhais&Subba Oil Field Project, 31 pcs Drain Vessels, Drain KO Drums & Air Receivers Manufacturing, ASME U Stamp, 2011 | |
Luhais&Subba Oil Field Project, Amine Contactor Tower & Vertical Amine Still Column Manufacturing (Facility #1), ASME U Stamp, 2012 | |
Khurmala Oil Field Project, Amine Contactor Tower & Vertical Amine Still Column Manufacturing (Facility #2), ASME U Stamp, 2012 | |
Khurmala Oil Field Project, 2 pcs. Pipeline Drain Back Vessel Manufacturing, ASME U Stamp, 2013 | |
Khurmala Oil Field Project, 1 pc. Salt Drier Vessel Manufacturing, ASME U Stamp, Erbil Refinery Expanding Project, 1 pc. D-T-502 Column Manufacturing, ASME U Stamp, 2017 | |
MAN B&W – Germany, | 9 sets Lube Oil Expansion Tanks Manufacturing, 2002 |
Sanko – Gaziantep, 3 sets WHRB for Gas Engine, 2003 | |
Nouakchott – Mauritania, WHRB Module Manufacturing, 2003 | |
Man Enerji – İstanbul, | Good Year – İzmit, By-Pass System, 1998 |
Çamsan – Ordu, Waste Heat Recovery System behind T60 Gas Turbine, 1998 | |
MASPO Enerji – İstanbul, | ALA-2 Project, 1 pc. Separator snd 1 pc. Accumulator Manufacturing, 2019 |
Metka – Greece, | OMV CCPP Terme– Samsun, 16 pcs. Tanks Manufacturing, 2011 |
MMK Atakaş Metalurji– Kocaeli, | Gebze, WHRB and Auxiliaries behind T70S Gas Turbine, 2011 |
MTU Motor Türbin – İstanbul | Hilton – Bursa, Waste Heat Recovery System behind 1286 kW Gas Engine, 2010 |
Saray Halı – Kayseri, 2 sets Cogeneration System behind 2145 kW G. Engine, 2010 | |
Selva – Konya, 1 set Gas Engine Cogeneration Plant with Container, 2010 | |
Gümüştaş Madencilik– Gümüşhane, 1 set Hot Oil Waste Heat Recovery System, 2010 | |
Başyazıcıoğlu Tekstil – Kayseri, Waste Heat Recovery System behind 2145 kW Gas Engine, 2011 | |
Dr. Ahmet Hospital–İstanbul, 1 set Hot Water Heater Boiler and System, 2011 | |
Konya Seker– Konya, 1 set Biogas Engine (AoB16V4000L62FB) Cogeneration Plant, 2011 | |
Acıbadem Hospitals–Eskişehir, Kayseri, Adana; 3 sets Hot Water Heater and System, 2012 | |
Medicana Hospital–Konya, 1 set Hot Water Heater and System, 2012 | |
TAI-Ankara, 4 sets Water Tube Type WHRB and System Manufacturing and Erection, 2014 | |
TAI-Ankara, 1 set Water Tube Type WHRB and System Manufacturing and Erection, 2017 | |
Multitex Filtration Eng. - India | 1 pc Closed Drain Sump Tank, 1 pc. Amine Drain Tank, 2 pcs. Amine Still Column ASME U Stamp, 2018 |
Nar Enerji– Tekirdağ, | 1 pc Raw (1000 m³) and 1 pc Demineralized Water Tank (200 m³), 2005 |
Ocala Energy Ltd– Venezuela, | 1 pc Wash Water Tank Manufacturing, 2015 |
Omnical GmbH – Germany, | Besler Gıda – İstanbul, 2 sets Waste Heat Recovery Boilers (Unit 1, 2), 1999 |
Menderes Tekstil – Denizli, 2 sets Waste Heat Recovery Boilers, 1999 | |
Mensa – Adana, 2 sets Waste Heat Recovery Boilers, 2001 | |
Alkim Kağıt – İzmir, 1 pc. Waste Heat Recovery Boiler, 2001 | |
Ormat Technologies –USA, | Mege – Aydın, 6 pcs. of Geothermal Water Storage Tank Manufacturing, 2009 |
Petkim Petrokimya, SOCAR | C-107 Column Manufacturing, 2016 |
D-1604 Drum Manufacturing, 2018 | |
C-302 Column Manufacturing, CE Marking, 2018 | |
C-501 Column Manufacturing, CE Marking, 2018 | |
C-201 Column Manufacturing with Monel Cladding, 2018 | |
H-894 Filter Manufacturing, 2019 | |
D-1012 Oxy-Catalyst Manufacturing, 2020 | |
D-203 Drum Manufacturing, 2020 | |
Pörner GmbH – Austria | Manufacturing of Biturox Reactor - ASME U Stamp, 2016 |
Manufacturing of Fuel Gas KO Drum - ASME U Stamp, 2016 | |
Biturox BBU Baku_SOCAR_Vessel Package (7 pcs.) - ASME U Stamp, 2017 | |
PSG Mühendislik – İzmir, | MTN Enerji – Tuzla, 2 pcs. of Pentane Tanks Manufacturing, 2015 |
S&W Energy-USA, | Alganim– Kuwait, 2 Units SS. Stacks for LM6000 Exhaust Silencing System, 2007 |
Siemens– Ankara, | Hanak– Ardahan, 3 Units Stack and Galvanize Duct, 2006 |
STEULER GmbH – Germany, | Birlik Enerji - Denizli, Power Plant De Sox System Modification, 2002 |
STM Sistem Teleferik – İzmir, | 3 pcs. Reactor Manufacturing, 2009 |
Solar Energy – USA, | Good Year – Adapazarı, Waste Heat Recovery Boiler Unit 2, 1998, |
Good Year – İzmit, Waste Heat Recovery Boiler, 1998, | |
Söktaş – Söke, | Stainless Steel Shell & Tube type Heat Exchanger, 1999 |
3 sets Pressurized Air Tanks Manufacturing, 2003 | |
Spig Soğutma Sistemleri – İzmir | 4 pcs NCG Extraction Tanks, 2016 |
Sultan Seracılık– Aydın, | 3 sets Steam and Brine Heat Exchanger Manufacturing, 2011 |
Şahinler Enerji – Çorlu, | Erenko – Çorlu, Steam Distribution System Piping, 2001 |
Merboy Tekstil – Çorlu, Steam Distribution System Piping, 2001 | |
Kasar Tekstil – Çorlu, Steam Distribution System Piping, 2003 | |
Tarkim – İstanbul, | 1 pc Fermentation Tank (500 m³), 2006 |
2 sets Methanol Tanks with Floating Roof (600 m³), 2008 | |
1 pc Methanol Tank with Floating Roof (1100 m³), 2012 | |
1 pc Ethanol Tank (1100 m³), 2014 | |
1 pc Ethanol Tank (561 m³), 2018 | |
Techicas Reunidas – Spain | Construction of HRSG modules and duct, Talara-Peru Plant, ASME S Stamp, 2016 |
Site Works of HRSG Modules, Talara-Peru Plant, ASME S Stamp, 2018 | |
Auxiliary Biomass Boiler Piping Prefabrication, 2018 | |
Boiler Feed Water Preheater, 2020 | |
Design, Fabrication and Supply of Package Boiler, 2021 | |
TİP TOP GmBH – Germany, | Afşin Elbistan Power Plant, Spool Pipe Welding at Workshops, 2003 |
Turbomach – Switzerland, | Akenerji Deba – Denizli, 2 sets Expansion Joints, 2002 |
Ayka Tekstil – Çorlu, WHRB and Auxiliaries behind T60 Gas Turbine, 2004 | |
Hayat Kağıt – Çorum, WHRB and Auxiliaries behind T70 Gas Turbine, 2004 | |
Kasar - Dual Textile– Çorlu, WHRB and Auxiliaries behind T60 Gas Turbine, 2008 | |
Altınmarka- İstanbul, WHRB and Auxiliaries behind M50 Gas Turbine, 2008 | |
Turboms – Pakistan, | 1 pc WHRB and Economizer, 2006 |
1 pc WHRB, Economizer and Feed Water Control System, 2006 | |
Tüpraş – İzmir, | FCC Unit, 3+3 pcs. 1st & 2nd Stage Regen Cyclones Manufacturing and 2+2 pcs. Riser & Outlet Reactor Cyclones Manufacturing, 2006 |
1 pc Condensate Drum Manufacturing, ASME U Stamp, 2011 | |
1 pc Stainless Steel “D-13C” Drum Manufacturing, 2012 | |
4 pcs Acid Drum Manufacturing, 2012 | |
1 pc D-468 Drum Manufacturing, 2013 | |
FCC Unit, 1st & 2nd Stage Regen Cyclones Manufacturing, 2014 | |
3 pcs Unit-7500 Rewamp Drums Manufacturing, 2014 | |
1 pc D-7514 Drum Manufacturing, 2014 | |
1 pc WFO D-1509 Drum Manufacturing, ASME U Stamp, 2016 | |
1 pc. D-1101 & D-1205 Drum Manufacturing, ASME U Stamp, 2017 | |
6 pcs. Drain Drums Tank Manufacturing – 2017 | |
1 pc. EC-107 Heat Exchanger Shell Manufacturing – 2017 | |
1 pc. E-458 Heat Exchanger Shell Manufacturing, ASME Partial U Stamp – 2017 | |
1pc.D-118&D-234&D-8422DrumsManufacturing,ASMEUStamp&ATEX–2018 | |
1 pc. R-9301 Stainless Steel Head Manufacturing, 2018 | |
1 pc. F-5301 Blowdown Stack Manufacturing, 2018 | |
1 pc. D-5121 Air Dissolving Drum Manufacturing, ASME U Stamp, 2019 | |
1 pc. LRS & HRS Drum Manufacturing for Batman Refinery, 2019 | |
1 pc. 7C-220 LPG – Disulphide Separator Drum Manufacturing, 2019 | |
1 pc. 7C-37 Gas Accumulator Vessel Manufacturing, 2020 | |
Ventech Engineers LLC – USA | Khurmala Oil Field Project, 6 pcs Process Columns Manufacturing for “F” Plant, ASME U Stamp, 2012 |
Khurmala Oil Field Project, Condensate Splitter & Naphtha Stabilizer Towers, ASME U Stamp, 2012 | |
Khurmala Oil Field Project, Flare KO Drum Manufacturing, ASME U Stamp, 2013 | |
Taq Taq Oil Field Project, Production Separators Manufacturing, ASME U Stamp, 2013 | |
Taq Taq Oil Field Project, Water Decanter Train Vessel Manufacturing, ASME U Stamp, 2013 | |
Taq Taq Oil Field Project, 4 sets Stainless Steel Vessels and Platforms Manufacturing, ASME U Stamp, 2013 | |
Republic Of Kazakhstan, 3 pcs Columns Manufacturing for Gasoline Plant, ASME U Stamp, 2014 | |
Republic Of Kazakhstan, Manufacturing of 1 pc of KO Drum, ASME U Stamp, 2014 | |
Republic Of Kazakhstan, Manufacturing of 1 pc of Flare KO Drum, ASME U Stamp, 2014 | |
Ventech İnşaat ve Tesisat A.Ş., | Taq Taq Oil Field Project, Closed Drain Vessel & Fuel Gas KO Drum Manufacturing, ASME U Stamp, 2013 |
Vestel – Manisa, | 55 000 m2 Refrigerator Factory, Mechanical Design, 1998 |
Wartsila – Berlin, | Zorlu Enerji – Bursa, Naturel Gas Buffer Tanks and Piping, 1999 |
Yerka Elektrik Üretim A.Ş. – İstanbul | 4 pcs. Gas separator Manufacturing, 2020 |
Yıldız Sunta – İzmit, | Waste Heat Recovery System behind T60 Gas Turbine, 1998 |
Yılmazlar A.Ş. – İzmit, | Boiler Modules and Drum Manufacturing, 2020 |
Zorlu Enerji AŞ – İstanbul, | Lüleburgaz, Power Plant Engineering Works, 1997 |
Bursa, Power Plant LM 2500+ & LM 6000 Engineering Works, 1998 | |
Bursa, Power Plant, Heat Recovery System Manufacturing and Installation, 1998 | |
Denizli, Kizildere Project, Geothermal Water Storage Tank Manufacturing, 2009 | |
Denizli, Kizildere Project, Manufacturing 11 pcs. Demisters & Separators, ASME U Stamp, 2011 | |
Denizli, Kizildere Project, Manufacturing 1 pc. Refrigerant Storage Vessel, ASME U Stamp, 2012 | |
Denizli, Kizildere Project, 32 pcs. Stainless Steel Rock Muffler Manufacturing, 2013 | |
Manisa – Alaşehir Project, 16 pcs. Stainless Steel Rock Muffler Manufacturing, 2015 | |
Denizli, Kizildere Project, 2 pcs. Revision for Seperators, 2015 | |
Denizli, Kizildere III Project, Manufacturing 7 pcs. Demisters & Separators, ASME U Stamp, 2016 | |
Denizli, Kizildere III Project, Manufacturing 1 pc. Separator, ASME U Stamp, 2016 | |
Denizli, Kizildere III Project -2nd Phase. , Manufacturing 1 pc. of Separator and 3 pcs. of Demisters, ASME U Stamp, 2017 | |