REFERENCES

Tüm Referanslar

3S Kale Enerji Üretim – İstanbul, Osmanbükü Project, Manufacturing 1 pc. Separator, ASME U Stamp, 2019
Aalborg Boilers – Denmark, Altınyıldız – İstanbul, Waste Heat Recovery Boiler, 1997
Goodyear – Adapazarı, Waste Heat Recovery Boiler, 1997
Orta Anadolu Tekstil – Kayseri, Waste Heat Recovery Boiler, 1998
Toros Gübre – Mersin, Waste Heat Recovery Boiler, 1998
Gaza Power Plant –Palestine, 4 sets, Blow Down Tank Manufacturing, 2000
Glaxo Wellcome – UK, Air Tank and Blow Down Tank Manufacturing, 2000
Tioxide – UK, Air Tank and Blow Down Tank Manufacturing, 2001
Aalborg Boilers – Finland, Aksa / Cengiz - Samsun, Spool Pipe Manufacturing, 2002
MOSB - Manisa, Waste Heat Recovery Boilers Platforms Manufacturing, 2005
44 sets Spool Pipe and Platform for Cuba Power Plant, 2007
Aalborg Energie Technik- Denmark MAV Biomass Power Plant, 3 pcs. Pressure Vessels. 2021
Aalborg Engineering – Denmark, Zorlu Enerji – Ankara, WHRB Support Structure and Duct Manufacturing, 2001
Ayen Enerji – Ankara, WHRB Duct Manufacturing, 2003
Zorlu Enerji–Kayseri, 3 sets WHRB Ducts and Deaerators Manufacturing, 2004
Çebi Enerji – Tekirdağ, WHRB Ducts, Deaerator, Tanks Manufacturing, 2005
Zorlu Enerji-Lüleburgaz, WHRB Support Structure, Ducts Manufacturing, 2005
BOSEN-Bursa, WHRB Support Structure Ducts, Deaerator Manufacturing, 2005
Zorlu Enerji–Russia, 6 sets HP and 6 sets LP Drum, 2007
Zorlu Enerji–Russia, 6 sets Duct Manufacturing, 2007
Delta Enerji- Çorlu, SG8 Type Boiler Modules and HP&LP Drum Manufacturing, 2008 
Cengiz Enerji–Samsun, 2 sets of Inlet Ducts Manufacturing, 2010
Cengiz Enerji, 2 sets Deaerator, Feed Water and Blow Down Tank Manufacturing, 2010 
Bosen Enerji–Bursa, 2 sets of SG8 Type Boiler Modules Manufacturing, 2010
ALES–Aydın, 1 set of SG8 Type Boiler Modules Manufacturing, 2011
Tüpraş–İzmir, 1 set of SG8 Type Boiler Modules Manufacturing, 2011
AGE–Denizli, 3 sets of SG8 Type Boiler Modules Manufacturing, 2011
Tüpraş–İzmit, 2 set of SG8 Type Boiler Modules Manufacturing, 2012
Tüpraş–İzmit, 1 set of SG8 Type Boiler Modules Manufacturing ”Replacement Project” , 2012
Tüpraş–Kırıkkale, 1 set of SG4 & 1 set of SG6 Type Boiler Modules and Drums Manufacturing, 2015
Akenerji – İstanbul, Mebal – Çorlu, Erection of Taurus 60 Turbine, Waste Heat Recovery System (2 sets), 2 pcs. 250 m3 Naphta Tank Design, Manufacturing and Erection, 25 t/h Deaerator and Feed Water Tank Design, Manufacturing and Erection, Stainless & Carbon Steel Piping and Insulation for System, 2000
Gürsu – Bursa, Erection of Taurus 60 Turbine, Waste Heat Recovery System (3 sets), 1 pc. of 350 m3 Naphtha Tank, Dearator and Feed Water Tank Design, Manufacturing and Erection, Stainless & Carbon Steel Piping and Insulation for System, 2001
Batıçim – İzmir, 2 pcs. 1000 m3 Water Tank Design, Manufacturing and Erection, 2002
Kemalpaşa – İzmir, 128 MW Combine Cycle Power Plant, Balance of Plant, Design, Manufacturing, Equipment Procurement, Erection, Commissioning, 2004 – 2005
Kemalpaşa – İzmir, 128 MW Combine Cycle Power Plant, 1 pc. 1200 m3, 1 pc. 270 m3 Water Tank and 1 pc. 530 m3 Diesel Storage Tank Design, Manufacturing and Erection, 2002
AKG Yalıtım– İzmir, 1 pc. Economizer for Steam Boiler, 2005
2 sets Economizer, 1 pc Heat Exchanger and 2 sets Jet-Cap Design, 2006
9 sets Autoclaves Lengthening, 2006
1 pc. Autoclave for Laboratory, 2007
1 pc. Water Heater Manufacturing and Erection, 2007
5 sets Autoclaves Manufacturing, 2008
Piping of 5 sets Autoclaves, 2008
9 sets Autoclaves Lengthening, 2014
Alkim Kağıt – İzmir, Kemalpaşa – İzmir, Waste Heat Recovery Boiler with Auxiliary Firing System, Main and By-pass Stack for Taurus 60 type Turbine, 2 pcs. 182 m3 Naphtha Tanks and Fuel System, 2001
Kemalpaşa – İzmir, Cogeneration Plant behind T60 Gas Turbine, 2011
Altınmarka – İstanbul, Manufacturing of Deaerator, Feed Water Tank, Heat exchanger and Platform, 2008
Arenko – İstanbul, Erbakır – Denizli, Cogeneration Plant, 2001
Arıtım Mühendislik – İstanbul, Birlik Enerji – Denizli, Vessels and Sand Filter Manufacturing 2001
Atakaş Metalurji – Gebze, WHRB and Auxiliaries behind T70S Gas Turbine, 2011
Atilla Makina– Ankara, Efemçukuru-Menderes Site, 1 pc. 28 m3, 1 pc. 1,5 m3 and 2 pcs. 0,75 m3 Pressurized Air Tanks Manufacturing, ASME U Stamp, 2010
Efemçukuru-Menderes Site, 1 pc. 50 m3 , 1 pc. 28 m 3 , 1 pc. 1,5 m 3 and 3 pcs. 0,75 m 3 Pressurized Air Tanks Manufacturing, ASME U Stamp, 2010
Efemçukuru-Menderes Site, 1 pc. 0,5 m3 Pressurized Air Tank Manufacturing, ASME U Stamp, 2011
Atlas Copco Makinaları – İstanbul, 2 sets Expander Housing and Supports Manufacturing, 2015
2 sets Silencers, 2016
1 set Expander Housing Manufacturing, 2016
1 set Expander Housing Manufacturing, 2018
1 pc. Expander Discharge Spool Manufacturing, 2018
1 pc. Housing Support & Base Machine Manufacturing, 2018
1 set Discharge Silencer, 2018
2 pcs. Housing Support Manufacturing, 2018
Machine Skid Base Manufacturing, 2018
1 pc. Expander Discharge Spool Manufacturing, 2019
2 sets Expander Housing Manufacturing, 2019
2 pcs. Discharge Silencer, 2019 
Barmek Gama – Ankara, Kırıkkale, 130 MW Power Plant Tanks Design, Manufacturing and Erection, 3x7500 m3 , 1x1000 m3 , 1x300 m3 , 4x200 m3 , 1x50 m3 , 3x40 m3 , 1x30 m3 , 1x20 m3 , 1x16 m3, 2001
Besler Gıda – İstanbul, Deaerator, Feed Water Tank and Condensate Tank Manufacturing, 2003
Bir Yapı – Ankara, Petkim – İzmir, 3 sets Sand Filters Manufacturing, 2003
Borusan Güç Sistemleri - İstanbul, Tanrıverdi Tekstil – Çorlu, 4 sets 3516B Gas Engine Cogeneration Plant, 2003
Aktin Tekstil – Çorlu, 4 sets. 3520 Gas Engine Cogeneration Plant, 2003
Saray Örme – Bursa, 3 sets 3516B Gas Engine Cogeneration Plant, 2003
Çelik Halat – İzmit, 2 sets 3516B Gas Engine Cogeneration Plant, 2003
Baydemirler – İstanbul, 3 sets 3520 Gas Engine Cogeneration Plant, 2004
Mercedes Benz – İstanbul, 4 sets 3520 Gas Engine Cogeneration Plant, 2004
Küçükçalık – Bursa, 4 sets 3520 Gas Engine Waste Heat Recovery System, 2005
Colin’s Jeans – Çorlu, 1 pc. 3516B Gas Engine Waste Heat Recovery System, 2005
Conrad – İstanbul, 1 pc. 3516C Gas Engine Waste Heat Recovery System, 2005
Kilsan-2 sets 3516C Gas Engine Cogeneration Plant, 2006
Tenghiz Chevron Oil–Kazakhstan, 2 sets 3512 Gas Engine Packing, 2003
Hurricane – Kazakhstan, 2 sets 3508 Gas Engine Packing, 2003
Coca Cola– Kazakhstan, 2 sets 3520 Gas Engine Waste Heat Recovery System, 2006
Four Seasons Otel– İstanbul, 1 pc. 3516B Gas Engine Waste Heat Recovery System, 2006
Safisa Otel– Antalya, 2 sets 3516B Gas Engine Cogeneration Plant, 2006 
Kurtoglu Aluminyum– Çorlu, 2 sets 3516B Gas Engine Cogeneration Plant, 2006
Botaş, 2 sets Duct Manufacturing for 3520C Gas Engine, 2007
Konya Şeker, 1 set 3520C Gas Engine Waste Heat Recovery Syst, 2007
Ormed II– Kazakhstan, 5 sets 3520C Gas Engine Cogeneration Plant, 2007
Pepsi Cola– Kazakhstan, 2 sets 3520C Gas Engine Waste Heat Recovery Syst, 2007
Mauri Maya– Bandırma, 2 sets 3520C Gas Engine Cogeneration Plant, 2007
Polat Hotel– İstanbul, 1 pc. 3516C Gas Engine Waste Heat Recovery Syst, 2007
Kipa Tesco– İzmir, 2 sets 3516B Gas Engine Waste Heat Recovery Syst, 2008
Melike Tekstil– Gaziantep, 1 set 3516C Gas Engine Cogeneration Plant, 2009
Naksan – Gaziantep, 4 sets 3520C Gas Engine Cogeneration Plant, 2009
Mardan Palace – Antalya, Changing of the By-pass System, 2009
Sabiha Gökçen Airport – 2 sets of Hot Water Boiler Manufacturing, 2009 
Orkide Yağ– İzmir, 1 set of 3516C Gas Engine Waste Heat Recovery System, 2010
Durum Gıda– Mersin, 1 set 3516C Gas Engine Waste Heat Recovery System, 2010
Bozetto Kimya – Tire, Textile Additives and Naphthalene Sultanate Production Plant, Turn-key, 1998
Erection of Reactor, Tank Manufacturing, Erection and Piping, 2003
Reactor and Neutralizer Tank Erection and Piping, 2007
1 pc. Formaldehyde Tank and 1 pc. Melter Tank Manufacturing and Erection, 2006
Bronswerk Heat Transfer BV-Holland 2 sets High Pressure Steam Generator, ASME Partial U Stamp, 2009
Can Tekstil – Çorlu, T60 Gas Turbine, Economizer Manufacturing behind WHRB, 2000
Waste Heat Recovery Boiler for Gas Engine, 2002
Camiş Elektrik – Lüleburgaz, Trakya Region Power Plant, Inlet Duct Manufacturing and Erection, 2009
Dan Power –Brasil, İpek Kağıt – Yalova, Waste Heat Recovery Boilers, 2004
Birlik Mensucat –Kayseri, By-pass System Manufacturing, 2004
Desa – İzmir, EnerjiSA – İzmit, Waste Heat Recovery Boiler Mechanical Design, 1997
Doğa Enerji – İstanbul, 20 MW Hot Water Boiler Boiler Design, 1997
Delta Enerji – Lüleburgaz Erection of SG8 type WHRB, 2009
Erection of ACC and Dresser-Rand "Murray" type Steam Turbine, 2009
Efor Makina- Ankara, Design of 6 Heat Exchangers, 2007
Enerjeo Holding - İstanbul, Kemaliye Project, Manufacturing 8 pcs. Separators, ASME U Stamp, 2015
Kemaliye Project, Manufacturing 3 pcs. Separators, ASME U Stamp, 2016
Enka Teknik – İstanbul, İzmir CCPP, Water Treatment System, Manufacturing and Erection, 2001
Eren Holding– İstanbul, Modern Enerji– Çorlu, 4 sets Water Heater, 2 units Stack, 2007
Çatalağzı Thermic Power Plant– Zonguldak, Detail Engineering of Main Cycles Including Steam, Feed Water and Condensate Systems, 2008    
Çatalağzı Thermic Power Plant – Zonguldak, 1 pc. Deaerator, 1 pc. Blow-Down Tank, 3 sets Air Tanks, 2 sets Fuel-Oil Tanks (1350 m³), 2 pcs. 25 t/h and 4 pcs. 52 t/h Heat Exchangers, 2008
Ergos SA – Spain, Besler Gıda - Istanbul, 2 sets Waste Heat Recovery Boilers (Unit 3, 4) 2002, 2003
Şahinler Enerji – Çorlu, 1 pc. Waste Heat Recovery Boiler, 2002
Besler Gıda – İstanbul, Economizer Installation, 2005
Exergy SPA – Italy Pamukoren Project, 2 pcs Vapour Headers Manufacturing, 2014
Pamukoren Project, 1 pc Vapour Header & 1 pc Hotwell Manufacturing, 2014
Karkey Project, 18 pcs NCG Extraction, 6 pcs Isopentane Drain Tanks, 2015
Greeneco Project, HP and LP Turbine Discharge Pipes, 2015
Greeneco Project, 2 pcs NCG Extraction, 2 pcs Isopentane Drain Tanks, 2015
E035 - Greeneco Project, ORC System Spool Piping Manufacturing, 2015
E028 - Ken Kipaş Project, ORC System Spool Piping Manufacturing, 2015
E029 - Ken Kipaş Project, ORC System Spool Piping Manufacturing, 2015
E035 - Greeneco Project, HP and LP Turbine Discharge Pipes, 2016
Greeneco Project, 2 pcs NCG Extraction, 2 pcs Isopentane Drain Tanks, 2016
2 pcs. Venture Tube Manufacturing, 2016
6 pcs NCG Extraction, 2 pcs Isopentane Drain Tanks, 2016
Spool pipes for ACC HP& LP System, 2016
2 Sets Manufacturing of ACC HP&LP Hotwell, 2016
6 pcs NCG Extraction, 2 pcs Isopentane Drain Tanks, 2016
E028 – E029 - Ken Kipaş Project, CCCW Spool Piping, 2016
E039 - Beştepe Project, Input Group, Condensate Knock-Out Pot 1 pc., Motive Fluid Storage Tank 2 pcs. Manufacturing, 2016
E041 – 2 pcs. HP and 2 pcs. LP NCG Extraction, 1 pc. Butane Drain Tank, 2017
E048 – 6 pcs NCG Extraction, 2 pcs Isopentane Drain Tanks, 2018
E050 - Input Group, 2019
E057 – ORC, Brine & CCCW spool Piping, 2020
EÜAŞ – Tunçbilek, Water Treatment Rehabilitation for 4th and 5th Unit of Thermic Power Plant, 2006
GEA-BTT – France Steam Distribution Duct Manufacturing, ASME Partial U Stamp, 2008
GEA- Germany Eren Holding–Çatalağzı, ESD&SDD Duct Manufacturing, 2007
Rostock, ESD&SDD Duct Manufacturing, 2007
Witzenhausen, ESD&SDD Duct Manufacturing, 2007
Bielefeld, ESD&SDD Duct Manufacturing, 2008
Gümüşköy Jeotermal A.Ş. – Aydın, Gümüşköy Project, Manufacturing of 3 pcs. Separators, 2015
Gümüşköy Project, Manufacturing of 1 pc. Accumulator and 2 pcs. NCG Separators Tanks, 2015
GÜRMAT – Aydın, Germencik-III Project, Manufacturing of 7 pcs of Pressure Vessels for Geothermal                      Power Plant, 2014
Germencik-III Project, Manufacturing of 2 pcs of Cross Over Duct for Geothermal                      Power Plant, 2014
Efe-III Project, Manufacturing of 3 pcs of Pressure Vessels (HP Separator, Demister & Brine Volume Tank) for Geothermal Power Plant, ASME U Stamp, 2014
Efe-II Project, Manufacturing of 1 pc of Pressure Vessel (HP Flash Separator Tank) for Geothermal Power Plant, ASME U Stamp, 2014
Efe-I Project, Manufacturing of 2 pcs of Pressure Vessel (HP Separator Tanks) for Geothermal Power Plant, ASME U Stamp, 2014
Efe-I Project, Manufacturing of 3 pcs of Pressure Vessels (LP Separators & Demister Tank) for Geothermal Power Plant, ASME U Stamp, 2014
Efe-I Project, Manufacturing of 1 pc of Pressure Vessel (HP Demister Tank) for Geothermal Power Plant, ASME U Stamp, 2014
Efe-IV Project, Manufacturing of 5 pcs of Pressure Vessels (HP Flash Separator, Demister, Brine Volume & Motive Fluid “Pentane” Tank) for Geothermal Power Plant, ASME U Stamp, 2014
Havatek – İzmir Separator and Desalter Manufacturing, 2020
HN Makine – İzmir, 5 sets Hot Water Heater (Biogas System) Manufacturing, 2018
İltekno – İstanbul, Etibor - Emet, 2 sets WHRB Partly Manufacturing, 2002
Özdilek - Bursa, 1 pc. WHRB Partly Manufacturing and Erection, 2002
İsko Tekstil – İnegöl, 2 sets Hot Water Heater behind Cogeneration System, 2001
Innovative Steam Tech – Canada, South Hedland Project, 2 sets Spool Piping Manufacturing, 2015
Kartonsan – İzmit, 2 sets Eco and Hot Water Heater for WHRB (Unit 1, 2), 2003
2 sets Eco and Hot Water Heater for WHRB (Unit 3, 4), 2005
Kar Group – Iraq Luhais&Subba Oil Field Project, 5 pcs LP Seperator, 10 pcs Flare Blowcases Tank Manufacturing, ASME U Stamp, 2010
Luhais&Subba Oil Field Project, 15 pcs Seperators & Glycol Contactors Manufacturing, ASME U Stamp, 2011
Luhais&Subba Oil Field Project, 31 pcs Drain Vessels, Drain KO Drums & Air Receivers Manufacturing, ASME U Stamp, 2011 
Luhais&Subba Oil Field Project, Amine Contactor Tower & Vertical Amine Still Column Manufacturing (Facility #1), ASME U Stamp, 2012
Khurmala Oil Field Project, Amine Contactor Tower & Vertical Amine Still Column Manufacturing (Facility #2), ASME U Stamp, 2012
Khurmala Oil Field Project, 2 pcs. Pipeline Drain Back Vessel Manufacturing, ASME U Stamp, 2013
Khurmala Oil Field Project, 1 pc. Salt Drier Vessel Manufacturing, ASME U Stamp, Erbil Refinery Expanding Project, 1 pc. D-T-502 Column Manufacturing, ASME U Stamp, 2017
MAN B&W – Germany, 9 sets Lube Oil Expansion Tanks Manufacturing, 2002
Sanko – Gaziantep, 3 sets WHRB for Gas Engine, 2003
Nouakchott – Mauritania, WHRB Module Manufacturing, 2003
Man Enerji – İstanbul, Good Year – İzmit, By-Pass System, 1998
Çamsan – Ordu, Waste Heat Recovery System behind T60 Gas Turbine, 1998
MASPO Enerji – İstanbul, ALA-2 Project, 1 pc. Separator snd 1 pc. Accumulator Manufacturing, 2019
Metka – Greece, OMV CCPP Terme– Samsun, 16 pcs. Tanks Manufacturing, 2011
MMK Atakaş Metalurji– Kocaeli, Gebze, WHRB and Auxiliaries behind T70S Gas Turbine, 2011
MTU Motor Türbin – İstanbul Hilton – Bursa, Waste Heat Recovery System behind 1286 kW Gas Engine, 2010
Saray Halı – Kayseri, 2 sets Cogeneration System behind 2145 kW G. Engine, 2010
Selva – Konya, 1 set Gas Engine Cogeneration Plant with Container, 2010
Gümüştaş Madencilik– Gümüşhane, 1 set Hot Oil Waste Heat Recovery System, 2010
Başyazıcıoğlu Tekstil – Kayseri, Waste Heat Recovery System behind 2145 kW Gas Engine, 2011
Dr. Ahmet Hospital–İstanbul, 1 set Hot Water Heater Boiler and System, 2011
Konya Seker– Konya, 1 set Biogas Engine (AoB16V4000L62FB) Cogeneration Plant, 2011
Acıbadem Hospitals–Eskişehir, Kayseri, Adana; 3 sets Hot Water Heater and System, 2012
Medicana Hospital–Konya, 1 set Hot Water Heater and System, 2012
TAI-Ankara, 4 sets Water Tube Type WHRB and System Manufacturing and Erection, 2014
TAI-Ankara, 1 set Water Tube Type WHRB and System Manufacturing and Erection, 2017
Multitex Filtration Eng. - India 1 pc Closed Drain Sump Tank, 1 pc. Amine Drain Tank, 2 pcs. Amine Still Column ASME U Stamp, 2018
Nar Enerji– Tekirdağ, 1 pc Raw (1000 m³) and 1 pc Demineralized Water Tank (200 m³), 2005
Ocala Energy Ltd– Venezuela, 1 pc Wash Water Tank Manufacturing, 2015
Omnical GmbH – Germany, Besler Gıda – İstanbul, 2 sets Waste Heat Recovery Boilers (Unit 1, 2), 1999
Menderes Tekstil – Denizli, 2 sets Waste Heat Recovery Boilers, 1999
Mensa – Adana, 2 sets Waste Heat Recovery Boilers, 2001
Alkim Kağıt – İzmir, 1 pc. Waste Heat Recovery Boiler, 2001
Ormat Technologies –USA, Mege – Aydın, 6 pcs. of Geothermal Water Storage Tank Manufacturing, 2009
Petkim Petrokimya, SOCAR C-107 Column Manufacturing, 2016
D-1604 Drum Manufacturing, 2018
C-302 Column Manufacturing, CE Marking, 2018
C-501 Column Manufacturing, CE Marking, 2018
C-201 Column Manufacturing with Monel Cladding, 2018
H-894 Filter Manufacturing, 2019
D-1012 Oxy-Catalyst Manufacturing, 2020
D-203 Drum Manufacturing, 2020
Pörner GmbH – Austria Manufacturing of Biturox Reactor - ASME U Stamp, 2016
Manufacturing of Fuel Gas KO Drum - ASME U Stamp, 2016
Biturox BBU Baku_SOCAR_Vessel Package (7 pcs.) - ASME U Stamp, 2017
PSG Mühendislik – İzmir, MTN Enerji – Tuzla, 2 pcs. of Pentane Tanks Manufacturing, 2015
S&W Energy-USA, Alganim– Kuwait, 2 Units SS. Stacks for LM6000 Exhaust Silencing System, 2007
Siemens– Ankara, Hanak– Ardahan, 3 Units Stack and Galvanize Duct, 2006
STEULER GmbH – Germany, Birlik Enerji - Denizli, Power Plant De Sox System Modification, 2002
STM Sistem Teleferik – İzmir, 3 pcs. Reactor Manufacturing, 2009
Solar Energy – USA, Good Year – Adapazarı, Waste Heat Recovery Boiler Unit 2, 1998,
Good Year – İzmit, Waste Heat Recovery Boiler, 1998,
Söktaş – Söke, Stainless Steel Shell & Tube type Heat Exchanger, 1999
3 sets Pressurized Air Tanks Manufacturing, 2003
Spig Soğutma Sistemleri – İzmir 4 pcs NCG Extraction Tanks, 2016
Sultan Seracılık– Aydın, 3 sets Steam and Brine Heat Exchanger Manufacturing, 2011
Şahinler Enerji – Çorlu, Erenko – Çorlu, Steam Distribution System Piping, 2001
Merboy Tekstil – Çorlu, Steam Distribution System Piping, 2001
Kasar Tekstil – Çorlu, Steam Distribution System Piping, 2003
Tarkim – İstanbul, 1 pc Fermentation Tank (500 m³), 2006
2 sets Methanol Tanks with Floating Roof (600 m³), 2008
1 pc Methanol Tank with Floating Roof (1100 m³), 2012
1 pc Ethanol Tank (1100 m³), 2014
1 pc Ethanol Tank (561 m³), 2018
Techicas Reunidas – Spain Construction of HRSG modules and duct, Talara-Peru Plant, ASME S Stamp, 2016
Site Works of HRSG Modules, Talara-Peru Plant, ASME S Stamp, 2018
Auxiliary Biomass Boiler Piping Prefabrication, 2018
Boiler Feed Water Preheater, 2020 
Design, Fabrication and Supply of Package Boiler, 2021
TİP TOP GmBH – Germany, Afşin Elbistan Power Plant, Spool Pipe Welding at Workshops, 2003
Turbomach – Switzerland, Akenerji Deba – Denizli, 2 sets Expansion Joints, 2002
Ayka Tekstil – Çorlu, WHRB and Auxiliaries behind T60 Gas Turbine, 2004
Hayat Kağıt – Çorum, WHRB and Auxiliaries behind T70 Gas Turbine, 2004
Kasar - Dual Textile– Çorlu, WHRB and Auxiliaries behind T60 Gas Turbine, 2008
Altınmarka- İstanbul, WHRB and Auxiliaries behind M50 Gas Turbine, 2008
Turboms – Pakistan, 1 pc WHRB and Economizer, 2006
1 pc WHRB, Economizer and Feed Water Control System, 2006
Tüpraş – İzmir, FCC Unit, 3+3 pcs. 1st & 2nd Stage Regen Cyclones Manufacturing and 2+2 pcs. Riser & Outlet Reactor Cyclones Manufacturing, 2006
1 pc Condensate Drum Manufacturing, ASME U Stamp, 2011
1 pc Stainless Steel “D-13C” Drum Manufacturing, 2012
4 pcs Acid Drum Manufacturing, 2012
1 pc D-468 Drum Manufacturing, 2013
FCC Unit, 1st & 2nd Stage Regen Cyclones Manufacturing, 2014
3 pcs Unit-7500 Rewamp Drums Manufacturing, 2014
1 pc D-7514 Drum Manufacturing, 2014
1 pc WFO D-1509 Drum Manufacturing, ASME U Stamp, 2016
1 pc. D-1101 & D-1205 Drum Manufacturing, ASME U Stamp, 2017
6 pcs. Drain Drums Tank Manufacturing – 2017
1 pc. EC-107 Heat Exchanger Shell Manufacturing – 2017
1 pc. E-458 Heat Exchanger Shell Manufacturing, ASME Partial U Stamp – 2017
1pc.D-118&D-234&D-8422DrumsManufacturing,ASMEUStamp&ATEX–2018
1 pc. R-9301 Stainless Steel Head Manufacturing, 2018
1 pc. F-5301 Blowdown Stack Manufacturing, 2018
1 pc. D-5121 Air Dissolving Drum Manufacturing, ASME U Stamp, 2019
1 pc. LRS & HRS Drum Manufacturing for Batman Refinery, 2019
1 pc. 7C-220 LPG – Disulphide Separator Drum Manufacturing, 2019
1 pc. 7C-37 Gas Accumulator Vessel Manufacturing, 2020
Ventech Engineers LLC – USA Khurmala Oil Field Project, 6 pcs Process Columns Manufacturing for “F” Plant, ASME U Stamp, 2012
Khurmala Oil Field Project, Condensate Splitter & Naphtha Stabilizer Towers, ASME U Stamp, 2012
Khurmala Oil Field Project, Flare KO Drum Manufacturing, ASME U Stamp, 2013
Taq Taq Oil Field Project, Production Separators Manufacturing, ASME U Stamp, 2013
Taq Taq Oil Field Project, Water Decanter Train Vessel Manufacturing, ASME U Stamp, 2013
Taq Taq Oil Field Project, 4 sets Stainless Steel Vessels and Platforms Manufacturing, ASME U Stamp, 2013
Republic Of Kazakhstan, 3 pcs Columns Manufacturing for Gasoline Plant, ASME U Stamp, 2014
Republic Of Kazakhstan, Manufacturing of 1 pc of KO Drum, ASME U Stamp, 2014
Republic Of Kazakhstan, Manufacturing of 1 pc of Flare KO Drum, ASME U Stamp, 2014
Ventech İnşaat ve Tesisat A.Ş.,  Taq Taq Oil Field Project, Closed Drain Vessel & Fuel Gas KO Drum Manufacturing, ASME U Stamp, 2013
Vestel – Manisa, 55 000 m2 Refrigerator Factory, Mechanical Design, 1998
Wartsila – Berlin, Zorlu Enerji – Bursa, Naturel Gas Buffer Tanks and Piping, 1999
Yerka Elektrik Üretim A.Ş. – İstanbul 4 pcs. Gas separator Manufacturing, 2020
Yıldız Sunta – İzmit, Waste Heat Recovery System behind T60 Gas Turbine, 1998
Yılmazlar A.Ş. – İzmit, Boiler Modules and Drum Manufacturing, 2020
Zorlu Enerji AŞ – İstanbul, Lüleburgaz, Power Plant Engineering Works, 1997
Bursa, Power Plant LM 2500+ & LM 6000 Engineering Works, 1998
Bursa, Power Plant, Heat Recovery System Manufacturing and Installation, 1998
Denizli, Kizildere Project, Geothermal Water Storage Tank Manufacturing, 2009
Denizli, Kizildere Project, Manufacturing 11 pcs. Demisters & Separators, ASME U Stamp, 2011
Denizli, Kizildere Project, Manufacturing 1 pc. Refrigerant Storage Vessel, ASME U Stamp, 2012
Denizli, Kizildere Project, 32 pcs. Stainless Steel Rock Muffler Manufacturing, 2013
Manisa – Alaşehir Project, 16 pcs. Stainless Steel Rock Muffler Manufacturing, 2015
Denizli, Kizildere Project, 2 pcs. Revision for Seperators, 2015
Denizli, Kizildere III Project, Manufacturing 7 pcs. Demisters & Separators, ASME U Stamp, 2016
Denizli, Kizildere III Project, Manufacturing 1 pc. Separator, ASME U Stamp, 2016
Denizli, Kizildere III Project -2nd Phase. , Manufacturing 1 pc. of Separator and 3 pcs. of Demisters, ASME U Stamp, 2017